maximum draught造句
例句與造句
- The ship's deadweight tonnage is 33, 980 tons at maximum draught and 26, 480 tons while operating at reduced draught in ice.
- The " Fremantle " s had a full load displacement of, were long overall, had a beam of, and a maximum draught of.
- With a maximum draught of between while loaded, the ships are limited only to a few deepwater ports in Brazil, Europe and China.
- The boats had a maximum length of 24.48m, a maximum width of 2.98m and a maximum draught of 1.1m, they carried loads of about 50 tonnes.
- She was beam of at her moulded depth and over the gun sponsons, and an initial maximum draught of, although this had increased to by 1936.
- It's difficult to find maximum draught in a sentence. 用maximum draught造句挺難的
- It can take ships with cargoes up to 5000 tonnes with a maximum length of 350 feet ( 107m ) and maximum draught of 7 metres.
- Further to dredging operations performed the port depths are increased to at crude oil discharging berths 1 4, allowing access to tankers having a maximum draught and.
- The 12-tonne vessel is built of glass-reinforced plastic, has a length of 13 metres with maximum draught at full load 0.90 m and has a bulletproof cabin.
- The maximum draught that can be achieved via rollers of radius R with coefficient of static friction f between the roller and the metal surface is given by
- Starting in the late 1960s, planning began for a new class of patrol boat to replace the long overall, had a beam of, and a maximum draught of.
- The canal, which had been limited to ships with a maximum draught of 53 feet, has been widened and now can accommodate a draught of up to 56 feet.
- Further to dredging operations performed the port depths are increased to 9 m at crude oil discharging berths 1-4, allowing access to tankers having an 8.5 m maximum draught and.
- The stern draught at the maximum displacement of 930 tons was defined in the contract as, but when " Murtaja " was delivered, her maximum draught was measured as at full load.
- Although the bottom deck, located below the waterline at maximum draught, was protected by a watertight stern door, flooding it while the ship was underway would not have compromised the stability of the vessel.
- The fuel consumption of the main engines at maximum draught is 50 tons of marine diesel oil ( MDO ) per day at full power, 25 tons at a service speed of, 10 15 tons during dynamic positioning and 4 tons at port.