√在线天堂中文最新版网,97se亚洲综合色区,国产成人av免费网址,国产成人av在线影院无毒,成人做爰100部片

×

performance test system造句

"performance test system"是什么意思   

例句與造句

  1. After carefully comparing various existing motor performance testing systems and pcs and digital instruments based automatic testing systems , an effective testing system with pc and data acquisition card is proposed . the fast t - n characteristic testing system with neither torque nor speed sensor implemented in the paper is an excellent example of this new type
    在分析了現(xiàn)有的各種電機性能自動測試系統(tǒng)的基礎(chǔ)上,本論文討論了基于pc機和數(shù)字化測試儀的電機性能自動測試系統(tǒng),提出了基于pc機和數(shù)據(jù)采集卡的電機性能自動測試系統(tǒng)。
  2. Based on the present research status of compressor performance test system and the problems appeared during the compressor performance test system being used , this paper has done some research mainly from theory and experiment about the compressor performance test with new refrigerant and other problems related
    本文根據(jù)目前壓縮機性能測試系統(tǒng)的研究現(xiàn)狀以及壓縮機性能測試系統(tǒng)在使用過程中所呈現(xiàn)的問題,主要從理論和實驗兩個方面來對采用了新型制冷工質(zhì)的壓縮機性能測試系統(tǒng)以及一些壓縮機測試相關(guān)的問題進行了研究。
  3. In this paper , the two kinds of sensor mainly used , swkp ig 20 and g16 are introduced . and the performance testing system of the two kinds of sensor is designed in terms of occurring troubles during the practice . the testing system consists of two parts , the hardware and the software
    本文針對目前國內(nèi)大量使用的、與進口防滑器配套的兩種速度傳感器: swkpig20型(電壓輸出型)和g16型(電流輸出型)在實際使用中出現(xiàn)的問題,設(shè)計了完整的性能檢測系統(tǒng),由硬件和軟件兩部分組成。
  4. This paper applies virtual instrument technology into the performance testing system of elevator tie - in , as well as brings forward and researches the performance testing system of tie - in based on virtual instrument , succeeding in having developed a set of high - power and low - cost test equipment and software
    本課題將虛擬儀器技術(shù)應(yīng)用到電梯接頭性能測試系統(tǒng)中,提出并研究了基于虛擬儀器的接頭性能測試系統(tǒng),成功的研發(fā)出一套高性能低成本的電梯接頭專用試驗設(shè)備和軟件。
  5. The thesis is based on the performance testing system of the automobile fittings for shaoxing automobile fittings factory . the aim is not only to develop a testing system which is rapid , wieldy and exact , but to improve the level of r & d for the fittings testing and short the cycle of the development and production of the new products , so that the factory can compete with profitably and benefit great from it
    本論文以紹興汽車配件總廠的“汽車配件性能測試系統(tǒng)”為主要研究背景的,目的在于建立一套能快速、易用、精確的汽車配件性能測試系統(tǒng),提高汽車配件測試的研究開發(fā)水平,縮短汽車配件的開發(fā)和出廠周期,減少試驗勞動強度,解決了汽車配件測試困難的問題,從而能增強廠家的競爭能力,提高其經(jīng)濟效益。
  6. It's difficult to find performance test system in a sentence. 用performance test system造句挺難的
  7. Applying virtual instrumentation technology , the author designed the hardware and software of the blower performance testing system . in the hand of hardware , testing data is acquired automatically according to press - difference sensor , press sensor and torch sensor ; blower speed is adjusted automatically according to frequency conversion of transducer and working state is auto controlled according to rotating baffle controlled by the step motor
    硬件上采用壓差傳感器、壓力傳感器和扭矩傳感器檢測各試驗數(shù)據(jù),實現(xiàn)了試驗數(shù)據(jù)的自動采集;利用變頻調(diào)速技術(shù)控制變頻調(diào)速器輸出信號的頻率,實現(xiàn)了風(fēng)機轉(zhuǎn)速的自動調(diào)節(jié);通過設(shè)置旋轉(zhuǎn)擋板裝置并用步進電機控制其旋轉(zhuǎn)角度實現(xiàn)了風(fēng)機運行工況的自動控制。
  8. Then , after studying the concept and characteristics and technical standards of real - time field test system and understanding some limitations existing in the current domestic brake test system and researching the detail of typical data acquisition system , the framework of automobile brake performance test system on - vehicle is proposed and the real application is introduced as a sample from the macroscopic definition of test technique
    在論述了實時在線測試系統(tǒng)的概念、特點以及相關(guān)技術(shù)標準之后,結(jié)合當(dāng)前國內(nèi)車載式制動性能測試系統(tǒng)的相對不足,再在對典型測試系統(tǒng)框架詳細構(gòu)成的研究基礎(chǔ)上,提出了車載式制動性能測試系統(tǒng)的整體框架,即從宏觀上研究了制動性能測試的方法。
  9. A test - bed of dg45 - 80 10 hypo - pressure feed water pump is designed , based on which the general on - line performance testing system is developed and the thermodynamic method is introduced to measure the efficiency of the pump . a new programming technology combining vc + + with matlab is presented by which the vibration monitoring system of boiler feed water pump is developed successfully to perform data analysis after on - line acquisition
    本文首先進行了次高壓鍋爐給水泵dg45 80 10實驗臺的設(shè)計,在此實驗臺設(shè)計成功并安裝調(diào)試通過的基礎(chǔ)上,開發(fā)了鍋爐給水泵通用性能試驗系統(tǒng),包括測點的布置、各型測量儀器的選購,設(shè)計,安裝和調(diào)試以及軟件平臺開發(fā)。
  10. 更多例句:  上一頁  

相鄰詞匯

  1. "performance test"造句
  2. "performance test code for utility boiler"造句
  3. "performance test for tower cranes"造句
  4. "performance test report"造句
  5. "performance test schedule"造句
  6. "performance tested"造句
  7. "performance testing"造句
  8. "performance testing station"造句
  9. "performance tests"造句
  10. "performance text"造句
桌面版繁體版English日本語

Copyright ? 2025 WordTech Co.