switching time造句
例句與造句
- With the great development of radar and microwave technology , it ' s necessary to increase switching time of mid frequency switch under the condition of high isolation and low insertion loss
隨著雷達(dá)以及微波技術(shù)的發(fā)展,對中頻開關(guān)的性能提出了越來越高的要求,主要是在高隔離度,低損耗的前提下,提高開關(guān)速度。 - Or come - and - go between international airlines , wander about in switch time of international time zone ' s difference , if not making strategic decisions in cbd , it is on canal bank looking forward to family ' s happiness dependence
或者來回往返于國際航線間,倘佯于各個國際時區(qū)的時差切換間,也許不在cbd運籌帷幄中,就在運河畔矚望家人幸福的依托。 - Finally , this paper inspects the problem in the switcher time of the enterprises combining movements in our country . in the movements people pay much too attention to short - term finance benefit , lack for the
最后考察轉(zhuǎn)軌時期我國企業(yè)并購中存在的問題,我國企業(yè)并購活動中過多的關(guān)注短期財務(wù)利益,并購交易完成后缺乏有效的措施整合獲得的資源,忽視財務(wù)競爭力培育。 - Frequency ’ s switching time , which directly affects the hopping speed of interferential system as well as radar ’ s frequency agility , is being paid more and more attention . this paper mainly analyzed the frequency synthesizer ’ s agile character
其中,捷變時間這一指標(biāo),由于直接影響到跳頻干擾和抗干擾系統(tǒng)的跳速,以及雷達(dá)頻率捷變特性,越來越受到人們的關(guān)注。 - Its intrinsic switching time is very short ; on the order of a picosecond . perhaps even more important is the low power dissipation ; superconducting circuits dissipate on the order of a microwatt per gate , a thousand times less than cmos circuits
這種數(shù)字電子技術(shù)具有高速、低功耗的特點,使用基于rsfq技術(shù)的邏輯電路的時鐘頻率可達(dá)到幾百個ghz ,而功耗只有0 . 3微瓦門。 - It's difficult to find switching time in a sentence. 用switching time造句挺難的
- The essential requirements for the frequency synthesizer are : 1 ) . low side band power 2 ) . high hopping speed 3 ) . short convergence time direct digital synthesis technology has the advantages of low cost , low power consumption , high frequency discrimination and short switching time
直接數(shù)字合成技術(shù)dds具有低成本、低功耗、高分辨率和快速轉(zhuǎn)換時間等優(yōu)點,是實現(xiàn)快速跳頻的一個關(guān)鍵技術(shù)。本文討論了如何實現(xiàn)高速的跳頻系統(tǒng)。 - Thirdly , some key technologies of optical layer protection such as fault monitoring , location , switching corporation , protection switching time were studied in chapter 3 , a method of optical power monitoring for primary path and otdr monitoring for protection path was provided
隨后研究了光層保護(hù)的網(wǎng)絡(luò)故障監(jiān)測、倒換判椐、故障定位、倒換協(xié)調(diào)、保護(hù)倒換時間等問題,提出了主通道光功率監(jiān)測、備用通道背向散射曲線監(jiān)測的故障監(jiān)測方法。 - Furthermore , introducing the controlling point of middle part temperature in column could make the quantity and quality of product better that those of the method only using top part temperature , and double - temperature controlling operation was more flexible , but switching times was more than single - temperature controlling
引入塔中溫度控制使產(chǎn)品數(shù)量、質(zhì)量及操作時間優(yōu)于單獨用塔頂溫度控制,而雙溫度控制操作彈性更高,但切換次數(shù)多于單溫度控制。 - Adsl line test is a part of our design , so it must under the control of higher level controller and there are multi - task for higher level controller to attemper . in the last part of article the programming methods becomes stress of our topic . on base of analyzing interrupt response time and task - switch time and task - attemperring time this article implements a method of transplanting ucos to c51 controller
Adsl線路測試部分是作為一個功能模塊存在于設(shè)計中的,它必須受到上層控制器的控制,而上層控制器有多個任務(wù)要執(zhí)行,本文最后一部分微控制器編程理論,重點分析微控制器的多任務(wù)消息驅(qū)動機(jī)制編程方法和嵌入式操作系統(tǒng)移植技術(shù),在分析兩種編程方法的任務(wù)響應(yīng)和任務(wù)切換及中斷響應(yīng)時間的基礎(chǔ)上,設(shè)計出了一套u(yù)cos移植到c51控制器上的方法。 - Then , detail discusses were given on . finally , on the basis of above analysis and research , by comparing various design methods , a l band agile frequency synthesizer with 256mhz bandwidth and 1mhz resolution was designed , whose switching time was within 4 us . however , the spur performance is to be improved
最后,在對各種捷變頻技術(shù)綜合分析和研究的基礎(chǔ)上,經(jīng)過反復(fù)的方案比較論證,設(shè)計了一個l波段256mhz帶寬,步進(jìn)為1mhz的捷變頻頻率合成器,捷變時間在4 s以內(nèi),不過雜散指標(biāo)還有待進(jìn)一步改進(jìn)。 - This new scheme can detect the malfunction of database system and superintend the operation system connecting to standby database when the host database is paralyzed . the entire switch time can be controlled in several minutes . after the host database restoring , all operations on standby database should be recurred on host database
自動切換功能可以在主用數(shù)據(jù)庫發(fā)生異常時自動切換到備用數(shù)據(jù)庫繼續(xù)工作,使數(shù)據(jù)庫故障對設(shè)備乃至網(wǎng)絡(luò)的影響時間控制在幾分鐘以內(nèi),主用數(shù)據(jù)庫恢復(fù)以后,在備用數(shù)據(jù)庫上進(jìn)行的操作應(yīng)該能恢復(fù)到主用數(shù)據(jù)庫上。 - The private enterprise governance system generally refers to how the business owner to operate private enterprise ' s domination among business owner ( chairman or general manager ) , the family members and external manager to carry on the effective disposition one the whole set contract arrangement . at the beginning of the private enterprise establishment , because of the system background of economical switcher time and the cultural history tradition habit factor , the private enterprise naturally has chosen the pattern which the family governs . the characteristic are the private enterprise owner and the enterprise members have the close blood relationship , the credit cost is low and the business owner property right , the
本文在回顧前人研究的基礎(chǔ)上,對這種現(xiàn)象的特點、弊端以及背后的社會原因和經(jīng)濟(jì)原因進(jìn)行了詳盡的分析,并提出了相應(yīng)的對策建議,認(rèn)為私營企業(yè)家族制治理向現(xiàn)代企業(yè)制度轉(zhuǎn)變是必然的趨勢,但是應(yīng)該本著實事求是的態(tài)度,不強(qiáng)制對企業(yè)改制,而是通過完善法律法規(guī)、建立良好的社會經(jīng)濟(jì)環(huán)境來誘導(dǎo)和促使私營企業(yè)建立真實有效的現(xiàn)代企業(yè)制度。 - The results show that : the lose of pressure is small when air velocity and the longth of honeycomb potter heat storage bed are varied ; but the switch time of air and the bulk of storage bed play important roles as regard its dynamic thermal performance
結(jié)果表明:蜂窩型陶瓷蓄熱體換熱器的壓力損失隨著空氣流速以及蓄熱體長度的不同而變化,但總體上說,其壓力損失并不大;四通換向閥的換向周期和蜂窩陶瓷蓄熱體換熱器的體積等是影響其溫度效率和熱回收率等熱性能的重要因素。 - Secondly , using the theory of modal analysis and the ansys modal analysis software , the modes and the vibratility of the thbip - , such as the inherent frequen - cies and the vibration modalities , are studied during its single - double support switch time , and more , combining with the experimental phenomenon , the developing trends of the real vibration properties of the thbip - are also discussed
其次,運用模態(tài)分析理論和ansys中模態(tài)分析軟件,進(jìn)行thbip -模態(tài)分析,研究支撐轉(zhuǎn)換期thbip -各階模態(tài)及其振動特性(固有頻率和振型) ,并結(jié)合實驗現(xiàn)象,對樣機(jī)結(jié)構(gòu)的振動特性趨勢進(jìn)行了初步的研究。 - Because of forecasting reactive load at first , it can detect the change of voltage at low - voltage bus from the change of reactive load or the change of voltage at high - voltage bus , then it can decide that adjusting transformer tap or capacitor switch , and avoid blindly and deficient adjusting . on the condition the reactive power is balanced and voltage qualified , it can realize the switching times of loaded taps and capacitors being efficiently decreased
由于預(yù)先預(yù)測出無功負(fù)荷,提前了解了無功功率變化的趨勢,可以有助于判定低壓母線電壓變化是由無功負(fù)荷變化引起還是由高壓側(cè)電壓變化引起,從而適時決定是調(diào)有載調(diào)壓變壓器分接頭還是投切電容器,以此避免了盲目和不充分的調(diào)節(jié),實現(xiàn)在保證無功基本平衡和電壓合格率的前提下,減少有載調(diào)壓變壓器分接頭的調(diào)節(jié)和并聯(lián)電容器組的投切次數(shù)。