√在线天堂中文最新版网,97se亚洲综合色区,国产成人av免费网址,国产成人av在线影院无毒,成人做爰100部片

×

單位工程的英文

發(fā)音:   用"單位工程"造句

例句與用法

  1. The thesis introduces the theory of database design , and combined with the practical engineering , list all kind of data in unit project ^ departmental project and item project
    本文詳細說明了數(shù)據(jù)庫設(shè)計理論,結(jié)合本系統(tǒng)的實際情況,列出了質(zhì)量評定過程中所涉及的各項數(shù)據(jù),包括單位工程、分部工程及分項工程各個方面的數(shù)據(jù)。
  2. In the engineering construction , especially in hydraulic engineering , it possess the great meaning in using value engineering to ana lyze merit ability and economic performance of its unit engineering , individual engineering and certain production technology and material
    在生產(chǎn)工程項目這個產(chǎn)品中,尤其是水利工程項目產(chǎn)品中,應(yīng)用價值工程對其單位工程、單項工程或某一個生產(chǎn)工藝及材料進行功能和經(jīng)濟效益價值分析,具有重大的意義。
  3. At last , combined with the practical project : yang jia wan 1 # bridge , which locate in k376 + 969 of the xiang wu section in xiang shi expressway , the analysis and establishment of the unit project departmental project and item project are described . the course of the quality estimation and exporting the report about these projects are introduced
    最后本文以襄十高速公路襄武段k376 + 969楊家灣1 #橋為例,具體描述了楊家灣1 #橋的單位、分部及分項工程劃分和建立,分項、分部及單位工程質(zhì)量評定的各個過程和分項、分部及單位工程質(zhì)量檢驗評定表的輸出過程。
  4. Main problems are the anti - slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design ; since there is no measurement certificate attached to the test report issued by the jincheng mine project quality inspection station of shanxi coal mine industry administration bureau , it will not be allowed to use these test reports as the one of unit project quality control documents
    主要是未按設(shè)計要求提供出鋼架連接處高強度螺栓抗滑移系數(shù)試驗報告和檢測紀錄;由山西省煤炭工業(yè)管理局晉城礦區(qū)工程質(zhì)量檢測站出具的試驗報告無計量認證章,在今后的工程中不能再作為單位工程質(zhì)量控制資料中的試驗報告。
  5. From the viewpoint of method , the first step is to determine the available investment options or opportunity set of the locations of crude oil tankers zone involving some six representative factors such as the unit engineering expense , unit operating cost , constructing period , the location land features , unit constructing engineering amount , unit land opportunity cost . these factors stem from the economic , societal and environmental regulations and rules . the second step is to specify how to choose among these available options
    從方法上來看,首先確定以單位工程造價、單位運行成本、建設(shè)期、地形特征、單位土建工程量、單位土地機會成本等六個綜合經(jīng)濟、社會及環(huán)境指標為代表的原油罐區(qū)方案決策目標集,其次制定桃園、西山、填海三個決策待選方案,然后建立基于優(yōu)先關(guān)系的相對優(yōu)屬度矩陣及各影響因素的權(quán)重集,從而進行模糊動態(tài)規(guī)劃評價,最后優(yōu)選出最佳的桃園方案。

百科釋義

    單位工程是指具備獨立施工條件并能形成獨立使用功能的建筑物及構(gòu)筑物。從施工的角度看,單位工程就是一個獨立的交工系統(tǒng),有自身的項目管理方案和目標,按業(yè)主的投資及質(zhì)量要求下,如期建成交付生產(chǎn)和使用。
    詳細百科解釋

相關(guān)詞匯

相鄰詞匯

  1. "單位剛度"英文
  2. "單位格子"英文
  3. "單位給水量"英文
  4. "單位根"英文
  5. "單位根 (計量經(jīng)濟學)"英文
  6. "單位工資單"英文
  7. "單位工作"英文
  8. "單位工作區(qū)間"英文
  9. "單位工作容積的功率"英文
  10. "單位工作容積功率"英文
桌面版繁體版English

相關(guān)閱讀

Copyright ? 2025 WordTech Co.