√在线天堂中文最新版网,97se亚洲综合色区,国产成人av免费网址,国产成人av在线影院无毒,成人做爰100部片

×

adit造句

"adit"是什么意思   

例句與造句

  1. Special drilling or adits outside orebody may be required .
    可能要求在礦體外作專門鉆探或坑探。
  2. Tbm roadway ripping machine used in adit construction
    巖巷掘進(jìn)機(jī)在平峒施工中的運(yùn)用
  3. Study on the adit stability under dynamic blasting load
    爆破動(dòng)載荷下平硐穩(wěn)定性的研究
  4. Adit prospecting engineering survey
    坑探工程測量
  5. Relationship between anisotropy of jinchuan rockmass and deformation and failure of adit
    金川巖體各向異性與巷道支護(hù)變形破壞關(guān)系探討
  6. It's difficult to find adit in a sentence. 用adit造句挺難的
  7. A feasibility study on prolonging the service life of the 290 level adit in nanfen surface mine
    南芬露天礦延長290平硐服務(wù)年限的可行性研究
  8. Measurement of the deformation of abandned adit pass at pit bottom caused by surface blasting
    露天采礦爆破對采場底部廢石平硐溜井影響的變形測量
  9. High accuracy through survey at adits of main and auxiliary shafts in tashan coalmine of datong coal industry group
    同煤集團(tuán)塔山礦主副井平峒高精度貫通測量
  10. Geotechnical investigation and testing - graphical presentation of logs of boreholes , trial pits , shafts and adits
    土工調(diào)查和檢驗(yàn).礦井孔試驗(yàn)坑豎井和入口測井記錄
  11. The measured adit water temperature verifies the predicted results and the system behavior proves desirable
    系統(tǒng)運(yùn)行后,坑道水溫度變化實(shí)測數(shù)據(jù)基本驗(yàn)證了預(yù)測結(jié)果,系統(tǒng)運(yùn)行效果良好。
  12. ( 2 ) the rock mass quality was assessed based on the data obtained from exploration adits with the methods of engineering geological classification for surrounding rock mass , bq , rmr and q - system successively . and th en the correlations between the assessment results of different methods were discussed
    基于勘探平硐獲取的資料,運(yùn)用“圍巖工程地質(zhì)分類法” 、 bq法、 rmr法和q系統(tǒng)法進(jìn)行了地下廠區(qū)巖體質(zhì)量評價(jià);討論了四種不同方法評價(jià)結(jié)果之間的相關(guān)性。
  13. The stabilities of the accumulations are analyzed by means of geological survey , drilling , exploratory adit , geophysical exploration and scientific research test etc . and then the relevant engineering treatments for various of the accumulations on the project are put forward as well
    在勘察過程中我們采用了地質(zhì)測繪、鉆探、硐探、物探、科研試驗(yàn)等多種勘察方法與手段,在勘察成果基礎(chǔ)上對堆積體穩(wěn)定性進(jìn)行了分析,并結(jié)合對工程的不同影響提出了相應(yīng)的工程處理措施。
  14. In order to scientifically manage exploration data , three - dimensional database composed of rock mass quality indices is established under the geodetic reference frame . those indices are obtained from adits , drill holes and outcrops . to efficiently make use of exploration data , finite testing results are spread to the extent which they can control in term of the characters of gradual change of rock mass quality
    利用實(shí)測資料,研究了單指標(biāo)(節(jié)理間距、完整性系數(shù)、 5m洞段節(jié)理?xiàng)l數(shù))劃分巖體質(zhì)量等級(jí)的對應(yīng)性,驗(yàn)證了單指標(biāo)(完整性系數(shù)k _ v 、節(jié)理間距d )和雙指標(biāo)( k _ v d 1000 )劃分巖體質(zhì)量等級(jí)的一致性。

相鄰詞匯

  1. "adisumarmo international"造句
  2. "adisumarmo international airport"造句
  3. "adisura"造句
  4. "adisura atkinsoni"造句
  5. "adisutjipto international airport"造句
  6. "adit entrance"造句
  7. "adit level"造句
  8. "adit mine"造句
  9. "adit mining"造句
  10. "adit nunatak"造句
桌面版繁體版English日本語

Copyright ? 2025 WordTech Co.