displacement n. 1.轉(zhuǎn)位,移動(dòng);取代,置換;(人的)流離失所。 2.撤換,免職。 3.【機(jī)械工程】(活塞)排氣量;【航?!颗潘俊惨话阒杠娕灥呐潘浚簧檀呐潘恳话阌?gross [net] ton(nage)〕。 4.【化學(xué)】置換(作用),取代(作用);【物理學(xué)】位移;【醫(yī)學(xué)】移位;【生物學(xué)】替位;【藥學(xué)】濾過(guò);【地質(zhì)學(xué);地理學(xué)】(斷層)移動(dòng)。 displacement nitration process 【化學(xué)】取代硝化。
maximum n. (pl. maximums, -ma ) 極點(diǎn),最大,最高,最高額,最大值;最高點(diǎn);最大限度;【數(shù)學(xué)】極大(值)(opp. minimum)。 The excitement was at its maximum. 興奮到極點(diǎn)。 adj. 最大的,最高的,頂點(diǎn)的,最多的。 maximum draught [draft] 【航?!孔畲蟪运疃取?maximum obscuration 【天文學(xué)】蝕甚。 a maximum range 最大射程。 a maximum thermometer 最高溫度計(jì)。
Study on the maximum displacements of bilinear system based on instantaneous input energy method 基于瞬時(shí)能量的雙線性系統(tǒng)最大位移研究
Analysis of the maximum displacement of isolation layer for base - isolated buildings with rubber bearings 建筑隔震橡膠支座的安裝質(zhì)量控制
The maximum displacement value is 0 . 5 - 1 . 5 times as much as the thickness of the glass 風(fēng)擋玻璃受鳥(niǎo)撞擊時(shí)的位移最大值達(dá)厚度的0 . 5 1 . 5倍。
The simulating results showed that maximum displacement and stress is affected by structure lengths 模擬結(jié)果為地道橋結(jié)構(gòu)設(shè)計(jì)提供了可靠的分析依據(jù)。
The results are that the maximum displacement and maximum stress occurs at initial time and the maximum stress is less than permissible stress 結(jié)果表明,結(jié)構(gòu)最大應(yīng)力和最大位移均發(fā)生在初始時(shí)刻,最大應(yīng)力小于許用應(yīng)力。
The smaller the stiffness and the bigger the mass and the damp is , the smaller the effect of static load on the maximum displacement is 建議以較為簡(jiǎn)單的無(wú)初始靜力荷載效應(yīng)時(shí)的瞬時(shí)動(dòng)力響應(yīng)作為結(jié)構(gòu)設(shè)計(jì)依據(jù),其結(jié)果趨于安全。
It is shown that distribution of dynamic response of dam is mainly alike . the maximum acceleration , the maximum displacement and the maximum shear stress are different obviously 可以看出,兩種方法算得的壩體動(dòng)力反應(yīng)分布規(guī)律基本一致,但壩體的峰值加速度、峰值位移及峰值動(dòng)剪應(yīng)力等均有明顯的差別。
Contracted with the calculations of dam in rigid foundation , the frequencies are lesson and periods of dam are lengthened because of elastic restraint of foundation . and under earthquake load , the maximum displacement of dam top is larger 與剛性地基下壩體計(jì)算結(jié)果相比,由于地基的彈性約束作用,壩體的自振頻率降低,周期延長(zhǎng);且在地震荷載作用下,壩頂最大動(dòng)位移增大。
It was shown that the maximum displacement occurred on the tunnel axis when one tunnel was excavated , while the maximum value happened near the shallow tunnel and between the area of two tunnels when two adjacent tunnels were excavated at the same time 分析結(jié)果表明:?jiǎn)螚l隧道開(kāi)挖引起的地表最大沉降值出現(xiàn)在隧道軸線的正上方,而兩左右或上下相鄰隧道開(kāi)挖的地表及土層內(nèi)部的最大沉降值則出現(xiàn)在兩隧道的縱軸線之間,且偏向上方埋深較淺的隧道。
The results proved that : ( 1 ) because of the material ' s difference of primer - 9 and primer - 5 , the maximum stress of primer - 5 is larger than primer - 9 but the maximum displacement is smaller than primer - 9 . ( 2 ) because of the unrenewable shape changing of primer - 9 after impacting by the pin , it will cracking under high pressure more easily . so , the paper give the suggestion that the designer should decrease the depth of impacting by pin in the case of the primer be fired successfully 對(duì)底- 9底火、底部被擊針撞擊后的第- 9底火和底- 5底火在膛壓作用下分別進(jìn)行了有限元數(shù)值分析,計(jì)算表明: ( 1 )底- 5底火底部擊針撞擊部位為火帽座,其材料為鋼帶,底- 9底部承受撞擊部位為底火體,其材料為冷拉退火圓鋼,由于材料強(qiáng)度不同,承受壓力能力和變形能力不同:雖然在膛壓作用過(guò)程中底- 5底火的最大應(yīng)力值比底- 9底火的大,但底- 5底火的最大位移量卻比底- 9底火的小得多。