3 to minimize impacts due to improper disposal of debris , all debris shall be loaded into sandbags and be removed from site at the end of each working day during the construction and dismantling period of the project 為減輕因不當處置垃圾造成的影響,在工程項目建造及拆卸期間的每個工作日完結(jié)前,須把全部垃圾放入沙包,然后搬離工地。